Anshen+Allen Boston, MA 2004-2009 |
School of Nursing, Skinner Hall, University of Massachusetts • Project architect for 55,000 SF renovation and addition including medical simulation • Assessed client's goals and developed design proposals to achieve objectives • Developed technical solutions for exterior and interior details • Led consultants in the integration of complex structural and mechanical systems • Achieved code compliance despite restrictive existing conditions • Supervised 5-person construction document preparation team • Construction administration including shop drawing review throughout project |
Amherst, MA |
Neonatal Intensive Care Addition, Woman and Infants Hospital • Project architect during construction of 160,000 SF, 120 bed neonatal intensive care unit • Client satisfaction achieved through attention to detail, teamwork and addressing the diverse requirements of clinical staff • Attended weekly job meetings with owner to address ongoing client interests • Led weekly field meetings with contractor and subcontractors to expedite construction • Shop drawing review |
Providence, RI | |
Nilsson Associates Boston, MA 2003-2004 |
Residence Hall, Endicott College • Project architect for 40,000 SF new construction, masonry veneer residence hall • Conducted user group meetings and integrated results in schematic design plans • Optimized planning by tabulating metrics such as cost per square foot and cost per bed • Responsible for supervision of contract document preparation • Led exterior and interior detailing • Spearheaded consultant coordination and value engineering |
Beverly, MA |
Bargmann-Hendrie Boston, MA 2001-2004 |
Lebanon Memorial Pool • Led 3-person design team; worked closely with client and principal-in-charge for design of competition pool, children's pool, bath house and filtration system • Responsible for compliance with extensive regulations due to location in flood plane • Led construction phase including attendance at weekly owner meetings, shop drawing review and periodic presentations to city counsel regarding project progress |
Lebanon, NH |
Robert Olson Architects Boston, MA 1997-2001 |
Boylston Hall, Harvard University • Worked closely with principal-in-charge to develop design and prepare contract documents for 4-story gut renovation project. Work included coordinating MEP in building with minimal floor to floor heights |
Cambridge, MA |
Department of Sociology Library, William James Hall, Harvard University • Responsible for library component of larger renovation, especially highly detailed millwork package • Achieved client’s budget during first round of bidding |
Cambridge, MA | |
Education |
Harvard University Graduate School of Design Cambridge, MA Master of Architecture 1994 |
|
Hampshire College Amherst, MA Bachelor of Arts 1984 |
||